Responsibilities include thorough inspection of all Zap-Lok pipe ends, with a focus on:
Visual Inspection of both pin and bell ends to ensure conformance with specifications.
Use of Precision Inspection Tools to verify:
Documentation and Reporting of inspection results using Excel; strong proficiency in Microsoft Excel is required for data entry, analysis, and reporting.