Manitoba Hydro is consistently recognized as one of Manitoba's Top Employers!
nature of work, operational requirements and work location.
Manitoba Hydro is a leader among energy companies in North America, recognized for providing highly reliable service and
exceptional customer satisfaction. Join our team of Manitoba's best as we continue to build a company that supports innovation,
commitment, and customer service, while actively supporting a diverse, equitable and inclusive workplace.
We are seeking a HVDC Design Engineer to work in the Station Design Department. Under the general direction of the Principal
HVDC Engineer or delegate, responsible to prepare conceptual and detailed design drawings, programming, procurement and
support for complex protection, control and metering systems in HVDC converter stations.
acceptance testing and support commissioning of HVDC systems, controls & protection for the Corporation's HVDC facilities.
reviews to ensure completeness prior to design approval.
specifications, analyze tenders, initiate a recommendation for purchase of materials, and manage contracts. Ensure follow-up
with vendors which may include the review and approval of manufacturer's documentation and design, determining and
assisting with shop or field tests, and liaison with suppliers as required. Lead or assist in the development and maintenance of
section's material and procurement systems and material database.
Remote Terminal Units (RTU) and Human Machine Interfaces (HMI) for the purposes of integrated substation automation
design.
corporation and external consultants on project activities to ensure that all share a common understanding of project
requirements and deliverables. Review and accept consultant's designs and reports ensuring compliance with project
specifications and standards.
two years are directly related to power system stations protection, control, and metering design. HVDC experience is
considered a strong asset.
and to the Station Automation System (SAS)/SCADA systems. Demonstrated working knowledge and experience in
MANITOBA HYDRO IS COMMITTED TO DIVERSITY AND EMPLOYMENT EQUITY
electro-mechanical, solid state and digital relay technology and applications on AC system protection.
microprocessor-based technologies and digital communications as applied to the design of complex protection, control,
metering and interlocking schemes associated with high voltage AC distribution, transmission, converter, hydro generation
and diesel generating stations.
construction practices related to protection, control and operational metering systems.
Starting salary will be commensurate with qualifications and experience. The range for the Professional Engineer II classification is
$43.44-$59.95 Hourly, $83,247.84-$114,870.60 Annually. The range for the Engineer-in-Training classification is $32.51-$45.74
Hourly, $62,293.92-$87,654.58 Annually.
Visit www.hydro.mb.ca/careers to learn more about this position and to apply online.
The deadline for applications is JUNE 24, 2025.
We thank you for your interest and will contact you if you are selected for an interview.
This document is available in accessible formats upon request. Please let us know if you require any accommodations
during the recruitment process.Notice: The inclusion of job postings or company information on our platform does not imply endorsement, partnership, or affiliation. Listings may include publicly available roles from various sources, and companies shown may not have a direct relationship with Energy Hire.