We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery.
Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers
As we continue to expand, Constructiv is building a pipeline of skilled construction professionals for future opportunities in the United States. While we currently do not have immediate openings, we want to connect with talented individuals in the data center construction industry who are open to exploring roles with us when the time is right.
Responsible for supervising on-site construction of a project(s) at one or more locations and serves as the General Contractor’s representative on the jobsite(s) under the direction and in partnership with the CM and the PM.
Travel
: This is not a remote role and requires regular travel, 80% or more
Major Responsibilities: Project Documentation:
Minimum Job Requirements Education
High School diploma
Certification / License
OSHA 30-Hour Certification
Work Experience
Previous experience in construction and/or craft supervision experience in construction.
Five (5) years of Data Center experience as a site super or project engineer, including experience with the installation of mechanical & electrical system.
Knowledge / Skills / Abilities
Education:
Bachelor’s degree in construction management.
Compensation
: Constructiv is committed to fair and equitable compensation practices. The annual salary for this role is $83,700 - $125,000.00. This compensation will ultimately be in line with the location in which the position is filled. Final compensation for this role will be determined by various factors such as a candidate’s relevant work experience, skills, certifications, and geographic location. This role is eligible for variable compensation including short term and long-term incentives.
Benefits
: This position includes a comprehensive benefit package that includes medical, dental and vision plans; life, long-term disability, flexible spending, and health savings accounts, accrued paid time off, 8 paid Holidays, opportunity for overtime and 401(k) retirement benefits;
Physical Demands
: While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion the incumbent may be required to stoop, bend or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision and ability to adjust focus. Occasional travel.
“We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law.”
Notice: The inclusion of job postings or company information on our platform does not imply endorsement, partnership, or affiliation. Listings may include publicly available roles from various sources, and companies shown may not have a direct relationship with Energy Hire.