pro IT

McCall Thomas Engineering Inc.
V-Tech Solutions

Georgia Transmission

Inframark

Inframark
EMISSION TESTING EQUIPMENT

McCall Thomas Engineering Inc.

Inframark

CAMS
L.L. Blue Engineering

Vulcan Materials Company

Sibelco Group

Clayton County Water Authority

SIBELCO

Oneda Corporation

Inframark

Textile Management Associates

PURIS
evTerra Recycling
Job Title : Fiber Technician/ GIS Specialist Duration: 6 + Months Location: Atlanta, GA 30346
Work as member of Joint USE/Fiber Make Ready Team to design communication line attachments to existing overhead utility poles in compliance with National Electrical Safety Code (NESC) and utility standards.
Occasionally conduct field assessments and pole surveys to evaluate existing conditions and pole loading capacity.
Utilize design software and GIS tools to create detailed construction drawings and layout plans.
Analyze pole loading, clearance requirements, and make-ready conditions for new attachments.
Prepare make-ready engineering (MRE) documentation, bills of material (BOM), and work packages for construction crews.
Ensure adherence to permitting requirements, safety standards, and right-of-way constraints.
Track project progress and maintain accurate records and data for compliance and reporting.
- GIS: 1 year (Preferred)
- electric utility: 1 year (Preferred)
- AutoCAD: 1 year (Preferred)